SAP Project Module


Posted on 16th Feb 2014 07:03 pm by admin

I have seen in the SAP Project Module,plan cost and budget are not equal and even difference is significal for e.g Plan cost is 112 million where as budget is 136 million. In this situation what will happen to POC if budget is equal to actual. Please explan because i have seen revenue from some project has over stated.

No comments posted yet

Your Answer:

Login to answer
170 Like 49 Dislike
Previous forums Next forums
Other forums

Why use interfaces in PHP (OOP)
I am learning OOP in PHP and its been a pretty good learning experience so far. What I didn't unders

Can php detect connection speed and thereafter swap out elements?
No code to post, lads, yet. Just looking for a yay or nay at this stage:

Can a php script be

FPDF Help
I've been playing with the FPDF module. I was building a form and rolling right along and then sudde

How to change www in url with a specified name
Hi
I'm trying to change the url http://www.sitename.com/apparels to something like below
http:

Showing selected item at top of list
Hi,

I've got a list of names which i am fetching from database like this:
$qry = db_query

php - xml what is the best way to do this.
IN essence I want to have a script calling the info from the database.. I have no problem thus far,

Looping Problem
I've got a client that has a database with about 200 events at any given time. I'm trying to loop t

Getting a variable to work in function params
I have this fuction which is inside a class:

Code: public static function generateEmbedCode($

Is there a more efficient way to code this than what I have?
I have three associative arrays.

$combinedSettings
$userSettings
$defaultSettings

PHP Thumbnail Creation
Ok so i use this function to create thumbnails:

Code: function createthumb($name,$filename,$n

Sign up to write
Sign up now if you have flare of writing..
Login   |   Register
Follow Us
Indyaspeak @ Facebook Indyaspeak @ Twitter Indyaspeak @ Pinterest RSS



Play Free Quiz and Win Cash