SAP Project Module


Posted on 16th Feb 2014 07:03 pm by admin

I have seen in the SAP Project Module,plan cost and budget are not equal and even difference is significal for e.g Plan cost is 112 million where as budget is 136 million. In this situation what will happen to POC if budget is equal to actual. Please explan because i have seen revenue from some project has over stated.

No comments posted yet

Your Answer:

Login to answer
170 Like 49 Dislike
Previous forums Next forums
Other forums

IIS on 2003 anon access disabled issue
I have an IIS server that belongs to a domain, and anonymous access is turned off for all my sites.

How do I get the row number from from an sql table query
Hi all

I have a table that I query and it returns a number of rows.
mysql_num_rows($query)

Multiple Options for a Single Page
For this example I want to use the Handlers option which is under Fed Admin and all the related codi

Hashing?
Hi, I was hoping to take a string value then convert it - consistently - across each of our pages in

Progress bar tracking file downloads
Hey guys, was wondering if there was a way to track how far a file has been downloaded. I know there

Custom Container in module pool program
Hello everyone,

I have created a custom control in my module pool screen. Now I want to s

Database connection failure
Hello All,

I am trying to create new connection to Oracle DB 10.1,
I could not see a

connect() succeeds but accept() does not?
Please help me with this problem. I'm working on a time-sensitive project where I'm using TCP socket

How to use Substr
I want to check for the word CATEGORY: inside a string which can be CATEGORY: ITEM
and remove the

How do I know when getBounds Method is ready to be called.
I have an application that changes out stylesheets client side. Once I change stylesheet the browse

Sign up to write
Sign up now if you have flare of writing..
Login   |   Register
Follow Us
Indyaspeak @ Facebook Indyaspeak @ Twitter Indyaspeak @ Pinterest RSS



Play Free Quiz and Win Cash