SAP Project Module


Posted on 16th Feb 2014 07:03 pm by admin

I have seen in the SAP Project Module,plan cost and budget are not equal and even difference is significal for e.g Plan cost is 112 million where as budget is 136 million. In this situation what will happen to POC if budget is equal to actual. Please explan because i have seen revenue from some project has over stated.

No comments posted yet

Your Answer:

Login to answer
300 Like 49 Dislike
Previous forums Next forums
Other forums

grouping within a foreach?
hello all,

I currently have a list of products spit out from my db via a foreach loop. Right

There was a problem with the request. (Code: 0)
Any Idea what could cause this? I get it randomly at best. But with both IE and FF. It derives from

Which practice of iteration through containers is preferred
In the "real world" what kind of loop do most people use to iterate through a container like a vecto

mr8m - reverse document
Friends,

I'm trying to reverse a document held by MIRO, but it reports the message balan

Help on code output
My CODE:

Code: [Select] echo "<phone>".$line["phone"].&qu

Displaying image pathname instead of image
Hello

Im trying to upload and then display images from a mysql database - Its only basic and

Re-Order by ID Number
I have a cms set up for inputting an image, thumb, title, pdf, and eps. When input the database ass

Filtering an Array Based on Value
I have a very simple script set up that pulls data from a database and is output using this code:

Database connection failure
Hello All,

I am trying to create new connection to Oracle DB 10.1,
I could not see a

New to PHP and just trying to understand a little code.
I hope I'm not annoying anyone or breaking the rules but I was wondering about this bit of code righ

Sign up to write
Sign up now if you have flare of writing..
Login   |   Register
Follow Us
Indyaspeak @ Facebook Indyaspeak @ Twitter Indyaspeak @ Pinterest RSS



Play Free Quiz and Win Cash