How to schedule the a job?


Posted on 16th Feb 2014 07:03 pm by admin

Hi,
I have prepared a task ( i.e. a procedure is prepare the file and send the same to concern mail address). That task should be done on everyday monrning 10 clock (except on sunday).

I am using Oracle 9i

please guide me.

No comments posted yet

Your Answer:

Login to answer
300 Like 45 Dislike
Previous forums Next forums
Other forums

ASP.NET Validation Event Cycle
Hi,
I have asp button as follow:

PHP, Arrays & A Lot Of Confusion
I've been doing basic PHP work on sites for a few years now, but I've never been tempted to learn ho

Renaming a file that a user uploads to site?
My site allows for registered users to upload images to the site under their own gallery. Currently

fire away
i launched about 4 months ago as a lagit co. i have 2 paying clients, 1probono, 1 side progect, and

Not connecting to DB using ruby, error:env.c:257:in oci8lib.so: ORA-12154:
Hi All,

I am trying to connect to the database server from the client server using ruby and f

Need help Updating SQL Server Express DB from c# :(
Please can anyone help with:-
1 How to sructure the strSelect statement.
2 How to instruct

Auto-populating dropdowns and multiple forms.
Here's what I have so far:

First drop down = select a state (works)
This populates the sec

Putting double spaces instead of single spaces
Im looking at trying to replace all single spacing between fields with double spacing

At pres

updating a single value to multiple non consecutive rows
I need to update the same value to multiple non consecutive rows. I need to add an experation date t

SAP Project Module
I have seen in the SAP Project Module,plan cost and budget are not equal and even difference is sign

Sign up to write
Sign up now if you have flare of writing..
Login   |   Register
Follow Us
Indyaspeak @ Facebook Indyaspeak @ Twitter Indyaspeak @ Pinterest RSS



Play Free Quiz and Win Cash